Signal work at Haywood         
Crews have left downtown Easley and now work to remove the signal bridge at the control point at Haywood north of downtown Easley. Cables are in place and cutting torches will be used to cut the steel near the braces supporting the horizontal portion of the signal bridge.
Date: 6/16/2014 Location: Easley, SC   Map Show Easley on a rail map Views: 92 Collection Of:   Carter Buchanan
Author:  Carter Buchanan
Signal work at Haywood
Picture Categories: Signal This picture is part of album:  Farewell to the Southern Railway signals in Easley, SC
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3876683