Crews have left downtown Easley and now work to remove the signal bridge at the control point at Haywood north of downtown Easley. Cables are in place and cutting torches will be used to cut the steel near the braces supporting the horizontal portion of the signal bridge. |
Date:
6/16/2014 |
Location:
Easley, SC Map |
Views:
92 |
Collection Of:
Carter Buchanan |
|
Author: Carter Buchanan
|
|
Picture Categories: Signal |
This picture is part of album: Farewell to the Southern Railway signals in Easley, SC |