Album Info:Norfolk Southern is redoing the signal system in many places. On June 16, 2014, 4 different sets of signals were removed.
  Page Controls   View:  Pics Per Page:
Last look at the northbound signal at Haywood
Title:  Last look at the northbound signal at Haywood
Description:  Crews are beginning work in downtown Easley, 2.5 miles north, on the signal cantilever. This signal will come down about 2 hours later.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:20:00 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  113   Comments: 0
NB Track 2 signal removed from cantilever
Title:  NB Track 2 signal removed from cantilever
Description:  I missed the first signal being removed, the old track 2 sb signal is being lowered beside the right of way.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:22:46 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  149   Comments: 0
Signal work
Title:  Signal work
Description:  Crews are lining up the new signal cantilever while another crew is removing the signals from the original Southern Railway signal cantilever. I always liked this style cantilever.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:24:17 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  100   Comments: 0
Next old signal to be removed
Title:  Next old signal to be removed
Description:  This is the track 1 southbound signal about to be removed as crews secure cables and chains to it to be lowered.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:26:11 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  76   Comments: 0
Final signal to be removed
Title:  Final signal to be removed
Description:  The final track 1 signal has been secured and now to be lowered. Afterwards, crews will secure the cantilever and cutting torches used to take it apart.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:27:45 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  74   Comments: 0
Cantilever removal
Title:  Cantilever removal
Description:  Crews are now securing the cable and chains to the old Southern signal cantilever as other crews on the new cantilever wire the new signals.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:29:35 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  80   Comments: 0
Cantilever cut and lowered
Title:  Cantilever cut and lowered
Description:  After the upper arm of the cantilever was secured, cutting torches were used near the 90 degree angle and then lowered trackside to be uploaded later in the day to a trailer.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:31:29 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  77   Comments: 0
First section lowered
Title:  First section lowered
Description:  Crews will center the chains and cable to swing this section further from the ROW. The old retired signals are in the foreground.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:33:25 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  88   Comments: 0
Second section of the Southern cantilever removed
Title:  Second section of the Southern cantilever removed
Description: 
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:35:49 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  76   Comments: 0
Old signal cantilever removal
Title:  Old signal cantilever removal
Description:  The last part of the cantilever will be placed on the ground and crews will center the cables and chains to move this section further from the ROW same as the first part that was removed.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:37:50 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  70   Comments: 0
Second section of the Southern cantilever removed
Title:  Second section of the Southern cantilever removed
Description:  Now resecured, the last section is being placed near the first part of the cantilever and will be hauled off later in the day.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:38:57 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  68   Comments: 0
Signal work progresses on the new signal
Title:  Signal work progresses on the new signal
Description: 
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:40:22 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  84   Comments: 0
Old signals
Title:  Old signals
Description:  After roughly 50 years of service, the Southern Railway installed signals from the 1960's are gone. The mayor of Easley was talking to the signal people about the old signal heads and seeing if it was possible to obtain them. I sure hope they can get them!
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:41:58 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  155   Comments: 1
Remains of the cantilever
Title:  Remains of the cantilever
Description:  Installed in the 1960's and around 50 years of service, this stout structure is now gone from the downtown Easley scene.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:43:34 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  81   Comments: 0
Signal work at Haywood
Title:  Signal work at Haywood
Description:  Crews have left downtown Easley and now work to remove the signal bridge at the control point at Haywood north of downtown Easley. Cables are in place and cutting torches will be used to cut the steel near the braces supporting the horizontal portion of the signal bridge.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:46:34 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories:  Signal
Locomotives: 
Views:  92   Comments: 0
Mid section removal
Title:  Mid section removal
Description:  With the steel of old signal bridge now cut, the cranes will move this section to the westside of the mainline.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:47:59 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  87   Comments: 0
Removal of the Haywood signal bridge
Title:  Removal of the Haywood signal bridge
Description:  The vertical sections of the Haywood signal bridge are now being lifted out of place, I am standing on the east side of the mainline.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:49:24 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  72   Comments: 0
East side Haywood signal bridge being lowered
Title:  East side Haywood signal bridge being lowered
Description:  Southern built a lot of signal bridges using old 40 ft boxcar underframes, such as this one. This signal bridge survived a derailment at this location sometime in the late 1980's leaving the dent in the structure you can see midway up in the steel.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:50:57 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  91   Comments: 0
West side support being removed
Title:  West side support being removed
Description:  Crews are now lowering the west side of the old signal bridge
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:52:31 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  61   Comments: 0
Old falls while new rises at Haywood
Title:  Old falls while new rises at Haywood
Description:  The west side of the signal bridge is still being lowered into place by the mainline while the new cantilever is being raised by another crew.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:53:52 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  64   Comments: 0
Raising the new Haywood signal cantilever
Title:  Raising the new Haywood signal cantilever
Description: 
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:55:38 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  61   Comments: 0
Raising the new Haywood signal cantilever
Title:  Raising the new Haywood signal cantilever
Description:  Crews have now lined up the new signal structure and are beginning to bolt it into place.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:56:48 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  77   Comments: 0
Haywood signals now complete
Title:  Haywood signals now complete
Description:  The construction crews have now completed work and now moving onto the next control point at Crosswell, 5 miles to the north. Electricians meanwhile are beginning their work on the wiring on this structure.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 3:58:41 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  73   Comments: 0
Remnants of the old Haywood signal bridge
Title:  Remnants of the old Haywood signal bridge
Description:  A cutting torch was used to cut the other end from the bracing that supported the structure for easier removal later on.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:00:07 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  64   Comments: 0
Looking northward at new signal
Title:  Looking northward at new signal
Description:  Amazing how the scene looks different 4 hours later after the first picture (at the beginning of this album). I like the old one better, always will.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:01:19 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  82   Comments: 0
Old signal head
Title:  Old signal head
Description:  I missed the signals being removed at Haywood, but here is the old track 2 signal lying beside the right of way and near the west side of the old signal bridge now lying on the ground.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:02:32 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  70   Comments: 0
A last look at the Crosswell signal bridge southbound
Title:  A last look at the Crosswell signal bridge southbound
Description:  The new signals at Crosswell have already been cut into service. Construction crews have completed work at the control point at Haywood in Easley, SC and are enroute to remove this structure next. With other things I needed to do, I didn't watch destruction of this signal bridge and it was way beyond hot.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:03:57 AM
Location:  Crosswell, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  123   Comments: 0
Signal testing resumes
Title:  Signal testing resumes
Description:  Returning back to downtown Easley, signal testing is taking place between Metler (CP south of Easley, not replaced this day, but soon coming in about 3 weeks from this day) and Crosswell, SC. The yellow over green "Approach Diverging" indication is on looking southbound on track 1.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:05:16 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  97   Comments: 0
It sure looks different now
Title:  It sure looks different now
Description:  Looking northbound, I sure miss the old signal cantilever. These signals are harder to view trackside now as well due to the hooded signals.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:06:39 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  84   Comments: 0
Another perspective looking northbound at Haywood
Title:  Another perspective looking northbound at Haywood
Description:  With no one on the signal cantilever now, a plain view of a otherwise blah style signal. A shame there was no way just to keep using the old more stout looking structures. Maybe this thing is stronger than it looks.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:08:02 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  64   Comments: 0
First official clear signal
Title:  First official clear signal
Description:  While maintainers are now observing the beginning of rail operations after the 8 hour outage, the first train to pass under the new signal cantilever is on the way. Still some tweaking will need to be performed for 48 hours afterwards to make sure everything is up to par.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:09:30 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  81   Comments: 0
First train under the new signal cantilever
Title:  First train under the new signal cantilever
Description:  Not the greatest light. But, NS 172 northbound with NS 2754 is the first train to pass under the new signals. Meanwhile crews are rounding up the last of the old signals at Easley and loading them on a trailer. A massive storm is approaching too, hitting minutes later.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:10:40 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  98   Comments: 2
Last signal being loaded up
Title:  Last signal being loaded up
Description:  The first signal to be removed from the old signal cantilever is the last to be loaded onto a trailer. All the trains that have been governed by these over the years now over.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:12:04 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  67   Comments: 0
Old signal structure being loaded onto trailer
Title:  Old signal structure being loaded onto trailer
Description:  Years of faithful service, now scrap metal. Too bad there was no way to preserve this thing.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:14:30 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  73   Comments: 0
Last section being loaded to trailer
Title:  Last section being loaded to trailer
Description:  The final piece of the old signal cantilever is now being loaded up and bound for scrap metal. The only thing now left is the old concrete base that this once massive structure sat on. A part of the Southern Railway engineering now gone.
Photo Date:  6/16/2014  Upload Date: 6/18/2014 4:15:43 AM
Location:  Easley, SC
Author:  Carter Buchanan
Categories: 
Locomotives: 
Views:  77   Comments: 0